For this primary bath, it was time to rework the space to change the functionality and ease of use. The clients did not use or need the tub (there is another tub in the home), and therefore wished to better use the space.
BEFORE
So that’s what we did! The vanity and toilet area stayed in the same locations, while the opposite wall was reworked to allow for a larger shower and bench, along with additional cabinet storage. New everything was brought in: tile, cabinetry, countertops, plumbing, lighting, and accessories.
AFTER
The results exceeded expectations, and the clients are ecstatic about their new bathroom. And that is the most important thing!
Cheers!
Design: Jaime Simpson of Creative and Curated
Contractor: DB Construction
After Photos: Lianna Pevar Photography